Offshore Artificial Island Mega-Project: Four reclaimed hydraulic sand islands constructed 80 km offshore in the Arabian Gulf to support 750,000 bopd oilfield production.
High-Permeability Seawater Recharge: Deep quay wall excavations inside newly dredged marine sand surrounded by open sea demanded rigorous seepage and drawdown modeling.
4-Stage Terraced Excavation Stability: Required staged multi-tier dewatering design calculations to prevent slope sloughing, piping, or loss of fines across 4 benches.
Critical Offshore Redundancy: Remote island logistics required 100% standby pumping redundancy and selfsufficient power/discharge engineering.
HOELSCHER SCOPE & KEY ACHIEVEMENTS
In-House Hydrogeological Design Calculations: Modeled island permeability, tidal recharge, and 4-stage drawdown rings to size deep wells, wellpoint headers, and filter packs.
Turnkey 4-Stage Dewatering Execution: Supplied, installed, and operated multi-tier perimeter dewatering systems lowered progressively across all 4 excavation steps.
100% Dry Quay Wall Construction: Maintained dry, stable formation beds below sea level throughout stone bedding and heavy precast concrete block placement.
Certified Offshore Delivery: Awarded Official ZADCO / HLG Certificate of Appreciation for successful beach well drilling and island dewatering.