Saadiyat Lagoons Pkg 3 — Soil Improvement Design & Execution

SOIL IMPROVEMENT DESIGN & DSM

CLIENT / EMPLOYER

Aldar Properties

PMC: Hill Int'l | Consult.: Parsons

Innovo Infra

Innovo Roads Infra. & Marine

MAIN CONTRACTOR

Saadiyat Island, Abu Dhabi

Saadiyat Lagoons Package 3

PROJECT LOCATION

Dec 2024 – Ongoing

PQ & Design Status: Code B

EXECUTION PERIOD

PROJECT OVERVIEW & SITE CHALLENGES

  • Flagship Master Development: Aldar’s Saadiyat Lagoons Package 3 comprises luxury residential villas and main infrastructure across coastal Saadiyat Island.
  • Compressible Sabkha & Liquefaction Risk: Native loose coastal sands and sabkha strata required finite-element ground modification design to control total and differential settlement.
  • Strict Bearing & Modulus Criteria: Required engineered composite ground modulus calculations to satisfy foundation bearing pressures and long-term serviceability.
  • Rigorous Parsons / Hill Int’l Review: All design calculation submittals, column grid layouts, and QA/QC testing protocols were governed by strict ADQCC and consultant standards.

HOELSCHER SCOPE & KEY ACHIEVEMENTS

  • Approved Specialist Design-Build Subcontractor: Prequalified and approved (Code B) by Aldar, Hill International, and Parsons for Ground Improvement Works.
  • In-House Ground Improvement Design: Prepared detailed analytical and FEM settlement, bearing capacity, and liquefaction mitigation calculations for DSM and rigid inclusion grids.
  • Turnkey DSM & Rigid Inclusion Execution: Executed insitu mechanical soil-cement mixing and rigid inclusion installation using automated batching and real-time drilling telemetry.
  • Full Field Verification & Load Testing: Validated design parameters through UCS core sampling, plate/zone load testing, and post-treatment verification per ADQCC specifications.