Al Maqtaa Bridge & Roads — Shoring Cofferdam & Pile Design

COFFERDAM & PILE DESIGN-BUILD

CLIENT / EMPLOYER

DMT / Musanada

Consultant: Tatweer – Opus JV

Agility Engineering & Cont.

Main Infrastructure Contractor

MAIN CONTRACTOR

Al Maqtaa Area, Abu Dhabi

Between the Two Bridges

PROJECT LOCATION

Jun 2019 – Sep 2020

Shoring Design: Approved

EXECUTION PERIOD

PROJECT OVERVIEW & SITE CHALLENGES

  • Strategic Waterway & Highway Gateway: Located between Al Maqtaa Channel and Abu Dhabi Gate adjacent to Al Maqtaa Castle, Al Maqtaa Bridge, and Sheikh Zayed Bridge.
  • Complex Cofferdam Structural Design: Deep bridge pier excavations inside the tidal channel required full PLAXIS/GEO5 earth retention, hydrostatic head, toe stability, and multi-level steel waling/strutting calculations.
  • High Lateral & Tidal Loads: Direct interface with tidal waterway and live highway embankment demanded zeroleakage interlocking sheet piling and rigid internal bracing.
  • Single-Source Design-Build Interface: Required unified engineering of temporary cofferdam shoring, permanent bored foundation piles, and 24/7 dewatering.

HOELSCHER SCOPE & KEY ACHIEVEMENTS

  • Approved Shoring Design Calculation Report: Authored and secured Musanada / Tatweer-Opus approval for the Temporary Marine Cofferdam Shoring Design Calculation Report.
  • Approved Piling & Shoring PQ & MS: Approved as specialist Piling, Shoring & Dewatering Design-Build Subcontractor.
  • Braced Cofferdam & Bored Pile Execution: Drove interlocking steel sheet pile cofferdams, fabricated/installed heavy steel waling and strutting frames, and cast largediameter bored piles.
  • 24/7 Groundwater Control: Engineered and operated highcapacity perimeter dewatering maintaining drawdown >300 mm below formation level.