Strategic Waterway & Highway Gateway: Located between Al Maqtaa Channel and Abu Dhabi Gate adjacent to Al Maqtaa Castle, Al Maqtaa Bridge, and Sheikh Zayed Bridge.
Complex Cofferdam Structural Design: Deep bridge pier excavations inside the tidal channel required full PLAXIS/GEO5 earth retention, hydrostatic head, toe stability, and multi-level steel waling/strutting calculations.
High Lateral & Tidal Loads: Direct interface with tidal waterway and live highway embankment demanded zeroleakage interlocking sheet piling and rigid internal bracing.
Single-Source Design-Build Interface: Required unified engineering of temporary cofferdam shoring, permanent bored foundation piles, and 24/7 dewatering.
HOELSCHER SCOPE & KEY ACHIEVEMENTS
Approved Shoring Design Calculation Report: Authored and secured Musanada / Tatweer-Opus approval for the Temporary Marine Cofferdam Shoring Design Calculation Report.