Yas Riva Waterfront — Revetment, Marine Piling & Shoring

DESIGN & MARINE PILING / SHORING

CLIENT / EMPLOYER

Aldar Properties

PMC & Consultant: AtkinsRéalis

Al Firas Gen. Cont. LLC

Main Marine & Civil Contractor

MAIN CONTRACTOR

Yas Island, Abu Dhabi

Waterfront Terrace & Outfalls 1 &

PROJECT LOCATION

Jan 2026 – Ongoing

Design & SD Status: Code B

EXECUTION PERIOD

PROJECT OVERVIEW & SITE CHALLENGES

  • Prestigious Waterfront Development: Aldar’s Yas Riva development on Yas Island features waterfront villas, marine terraces, and coastal storm/outfall structures.
  • Complex Marine & Terrace Loading: Marine driven steel piles for the Waterfront Terrace and Outfall No. 2 required rigorous axial, lateral wave/current, and uplift design checks.
  • Aggressive Marine Corrosion Regime: Required explicit sacrificial steel thickness loss calculations across design life in accordance with BS EN 1993-5:2007.
  • Deep Outfall Excavations at Shoreline: Outfall No. 1 and Outfall No. 2 required engineered temporary interlocking steel sheet pile walls to retain saturated coastal soils.

HOELSCHER SCOPE & KEY ACHIEVEMENTS

  • Approved Terrace Pile Design Calculations: Prepared and secured AtkinsRéalis Code B approval for the Driven Marine Piles Design Calculation for the Waterfront Terrace.
  • Approved Outfall 2 Pile Design Calculations: Engineered and secured AtkinsRéalis Code B approval for the Marine Pile Design Calculation for Outfall No. 2.
  • Approved Temporary Sheet Pile Shop Drawings: Secured AtkinsRéalis Code B approval for Outfall No. 1 & No. 2 Temporary Sheet Pile Shoring Shop Drawings.
  • Turnkey Marine Piling & Shoring Execution: Mobilized specialized marine piling rigs, vibro hammers, and cranes to execute the approved piling and sheet pile shoring works.